Welcome to the Building Control Management System (BCMS)
BCMS Search results
The information requested and supplied was compiled by this office for the purposes of fulfilling the statutory obligation to maintain a publicly available register of building control activity.
As a holder of this information it is important that you should be aware of your obligations as a data controller under the Data Protection Acts 1988 and 2003.
While the provisions of the Data Protection Acts 1998 and 2003 are outside the scope of the Local Government Management Agency/Building Control Authority it is understood that they place clear limits on the use of publicly available data for marketing or other purposes. Any person who proposes to use such information in this way is considered to be a data controller for the purposes of the Data Protection Acts. Section 2(8) of the Data Protection Acts provides that where a data controller anticipates that personal data will be processed or used for the purposes of direct marketing, including personal data that is required by law to be made available to the public, the data controller shall inform the persons to whom the data relates so that they may object, by means of a request in writing to the data controller and free of charge, to such use.
Breaches of Data Protection legislation are a matter for the Data Protection Commissioner who has the power to investigate such matters and, where appropriate, prosecute offences under the Acts.
-
Coolough Student Accommodation - Block A Coolough Road, , Galway, Galway,Description:
The development will consist of Student Housing Development comprising of 257 no. bedrooms, along with ancillary student facilities to include student amenity space, student gym, laundry, reception/security area, refuse areas, ESB Substation and Gas Skid split between 2 no. blocks (Block A and Block B) within the site curtilage. The height of Block A extends to 3 storeys with Block B ranging from 1 to 4 storeys, along with an additional plantroom level and outdoor plant compound. The development will also provide for car, motorbike and bicycle parking spaces, and a coach drop off with bus shelter and all associated site development works, including landscaped areas, boundary treatments, drainage works, lighting, site services and infrastructure provision to facilitate the development.
-
New dwelling at Drumrane Drung Co. Cavan Drumrane Drung Co. Cavan, , Drumrane Grove, Cavan,Description:
Construct new detached two storey dwelling and all associated site works
-
New Dwelling House at Casheleenan, Kilmacrennan (24/61269) Casheleenan, , Tawney Upper, Donegal,Description:
Erection of a Dwelling house with all associated site development works
-
Residential Development at Water Rock Manor (CN No.2) Water Rock Manor, Waterrock, , Midleton, Cork,Description:
Construction of 82 Dwellings at Water Rock Manor, Water Rock, Midleton, Co. Cork
-
New Bungalow Dwelling Clondoolusk, , PORTARLINGTON, Offaly,Description:
Bungalow dwelling & all associated site works
-
Seapoint Bray (Block B) Seapoint Road, , Bray, Wicklow,Description:
Construction of 4 storey over undercroft apartment block (Block B) comprising of 20 No. apartment together with associated ancillary accommodation
-
a Opt out two storey house, , septic tank, percolation area and entrance Clonely, , Drombane Thurles, Tipperary,Description:
Opt out two storey house, , septic tank, percolation area and entrance
-
Alterations of Residential Dwelling to be changed to a Community School in Barry, Keenagh Barry, , Keenagh, Longford, N39 F821Description:
Change of use from a Residential Dwelling to a Community School in Barry, Keenagh
-
Seapoint Bray (Block A) 32A Seapoint Road, , Bray, Wicklow,Description:
Construction of five-storey over undercroft apartment block (Block A) comprising of 26 No. apartment together with associated accommodation at ground floor level
-
MRH - Renal Department Reconfiguration Midlands Regional Hospital Tullamore, Arden Road, Puttaghan, , Tullamore, Offaly, R35 NY51Description:
The project will be delivered in multiple phases to include reconfiguration of internal space, new storage room, isolation rooms, acute ward and general refurbishment of the renal ward.
Application No.: