Welcome to the Building Control Management System (BCMS)
BCMS Search results
The information requested and supplied was compiled by this office for the purposes of fulfilling the statutory obligation to maintain a publicly available register of building control activity.
As a holder of this information it is important that you should be aware of your obligations as a data controller under the Data Protection Acts 1988 and 2003.
While the provisions of the Data Protection Acts 1998 and 2003 are outside the scope of the Local Government Management Agency/Building Control Authority it is understood that they place clear limits on the use of publicly available data for marketing or other purposes. Any person who proposes to use such information in this way is considered to be a data controller for the purposes of the Data Protection Acts. Section 2(8) of the Data Protection Acts provides that where a data controller anticipates that personal data will be processed or used for the purposes of direct marketing, including personal data that is required by law to be made available to the public, the data controller shall inform the persons to whom the data relates so that they may object, by means of a request in writing to the data controller and free of charge, to such use.
Breaches of Data Protection legislation are a matter for the Data Protection Commissioner who has the power to investigate such matters and, where appropriate, prosecute offences under the Acts.
-
New Dwelling, Caher Rd, Mungret Caheranardrish, Caher Rd., Mungret, limerickDescription:
Demolition of an existing dwelling house, construction of a replacement dwelling house, garden shed,site entrance, onsite waste-water treatment & disposal system and all ancillary works
-
New dwelling house and associated works at Tullyard, Kill, Cootehill, Tullyard, Kill,, Cootehill,, cavanDescription:
Construct new dormer style dwelling house, form new site entrance with piers and wing walls, install proprietary mechanical wastewater treatment system
-
SRBP-U18 CLOSING OFF OPE UNIT 18 SOUTH RING BUSINESS PARK, KINSALE ROAD, BALLYCUREEN, corkDescription:
CLOSING OFF OF INTERNAL ACCESS BETWEEN UNITS 17 & 18 SRBP
-
6 Agnes Road, Crumlin, Dublin 12 6 Agnes Road, Crumlin, dublin_12Description:
demolition of rear shed, new site entrance and alterations to existing two storey terraced building including change of use at ground floor level of existing retail and residential use to dental surgery and reconfiguring of first floor existing residential use to two bedroom apartment, related facade alterations, signage, new rooflights, rear balcony and external stairs addition and associated works
-
Waste Water Treatment System Wimbletown Ballyboughal Wimbletown, Ballyboughal, dublinDescription:
The replacement of the existing waste water treatment system with a new waste water treatment system and associated works.
-
Dwelling at Meadstown, Dunderry Meadstown, Dunderry, meathDescription:
One and a half storey dwelling, detached garage, new entry onto existing cul-de-sac, septic tank, percolation area and all associated site works
-
SNU & Entrance extension to Scoil Chaoimhin Naofa, Glendalough Brockagh, Glendalough, wicklowDescription:
Construction of a single storey extension to the north of the existing school to include a new SNU classroom and support spaces and a single storey entrance extension to the south to include an entrance area and reception office along with all associated site works.
-
Residential Development of 1 house at Lackareagh, Lissarda Lackareagh, Lissarda, corkDescription:
Demolition of existing house & construction of replacement house, waste water treatment system & modification to existing farm gate entrance to provide new house entrance.
-
Jonathan Foley & Fiona Curran Dromin West, , Milltown,, kerryDescription:
Construction of a dwelling house with connection to septic tank and percolation area and all associated site works
-
Lands at Wilton Place, Lad Lane, Pembroke Row, Dublin 2 Lands at Wilton Place, Lad Lane, Pembroke Row, dublin_2Description:
The overall development consists of a new office building of six storeys (over basement); approx. 17,658 sq.m; this element of the project consists of the erection of hoardings around the site, demolition of existing buildings, removal of existing overground and underground fuel tanks, incl any contaminated soil; all in preparation for the future development of the site.