Welcome to the Building Control Management System (BCMS)

Notice Name:

Glass Bottle Phase 2 - Basement

Print page
Development location: 
Glass Bottle Site, Sean Moore Road, , Ringsend, Dublin 4,
Description: 
Glass Bottle Phase 2 – Basement - 1No. Level of basement and associated basement escape stair and lift pop ups at Ground Level. The new residential development, Phase 2 Glass Bottle, will consist of five residential blocks situated over a common basement at Glass Bottle Site, Sean Moore Road, Dublin 4 This commencement notice comprises of the following • 1No. Level of basement and associated basement escape stair and lift pop ups at Ground Level. This commencement notice is concerned solely with the initial phase of the development which comprises the Basement Level. As part of this commencement notice, there is no accommodation proposed at Ground Floor Level or above Ground level with the exception of the stair and lift pop ups at Ground Level. In tandem to this commencement notice, 2 No. additional commencement notices have been lodged as follows: • Block D1 and D2 Residential • Block E1, E2 and E2A Residential Blocks
Notice type: 
7 Day Notice
Notice number: 
SN0011324DC
Local authority: 
Dublin City Council
Commencement date: 
Monday, 7 October, 2024
Plannning permission number: 
PWSDZ3700/24
Submission date: 
Monday, 30 September, 2024

Owner:

Owner name: 
Pembroke Beach DAC
Owner company: 
Pembroke Beach DAC
Owner address: 
27, Dublin 2, Dublin,

Builder:

Builder name: 
John Donohoe

Builder address

Block E, Harcourt Road, Dublin 2 , Dublin, D02 YT22

Designer:

Designer name: 
Gareth Maguire

Designer address

Dartry Mills, Dublin, Dublin, D06 Y0E3

Certifier:

Assigned Certifier Name: 
Rory Murphy

Assigned Certifier address

Reddy Architecture + Urbanism, Dartry Road, Dublin 6, Dublin, D06 YOE3