Welcome to the Building Control Management System (BCMS)

BCMS Search results

132596 results

The information requested and supplied was compiled by this office for the purposes of fulfilling the statutory obligation to maintain a publicly available register of building control activity.
As a holder of this information it is important that you should be aware of your obligations as a data controller under the Data Protection Acts 1988 and 2003.
While the provisions of the Data Protection Acts 1998 and 2003 are outside the scope of the Local Government Management Agency/Building Control Authority it is understood that they place clear limits on the use of publicly available data for marketing or other purposes. Any person who proposes to use such information in this way is considered to be a data controller for the purposes of the Data Protection Acts. Section 2(8) of the Data Protection Acts provides that where a data controller anticipates that personal data will be processed or used for the purposes of direct marketing, including personal data that is required by law to be made available to the public, the data controller shall inform the persons to whom the data relates so that they may object, by means of a request in writing to the data controller and free of charge, to such use.

Breaches of Data Protection legislation are a matter for the Data Protection Commissioner who has the power to investigate such matters and, where appropriate, prosecute offences under the Acts.
  • Replacement Dwelling , Monlena Monlena, Newcastle West, limerick
    Description:

    Demolition of existing dwelling house, construction of a replacement dwelling house, site entrance; onsite waste-water treatment & disposal system and all ancillary works

    14/592 View details
  • Rafter Dwelling Carha, Bonniconlon, mayo
    Description:

    The construction of a dwelling house and domestic garage, on-site effluent treatment system including ancillary site development works.

    10/1044 View details
  • Extension to rear of house 7 The Maltings, Skerries, dublin
    Description:

    Construction of a two storey and single storey extension to rear of house, an amended single storey porch to front of house, amendments to window openings to side elevation and all associated site works

    F14B/0008 View details
  • Wastewater Treatment System at Butlersgrange, Tullow Co. Carlow Butlersgrange, Tullow, carlow
    Description:

    the decommissioning of existing septic tank and installation of a new wastewater treatment system and soil polishing filter with all associated site development works at Butlersgrange, Tullow, Co. Carlow.

    14284 View details
  • 58 Convent court 38 Convent Court, Delgany, wicklow
    Description:

    New single story extension to rear of existing house and new 1.8m high boundary wall to front and side garden.

    14/1784 View details
  • extension to existing dwelling house at Claddaghduff Claddaghduff, Claddaghduff, galway
    Description:

    Construction of extension to existing dwelling house -(gross floor area 39.47 sq.m)

    14/1008 View details
  • Alterations & Extension to an existing private dwelling at Cahore, Ballygarrett, Gorey, Co. Wexford Cahore, Ballygarrett, Gorey, wexford
    Description:

    Demolition of an existing single storey extension to rear, and the construction of a new split level single storey extension to rear and a new single storey extension to gable-end of existing end-of-terrace single storey cottage, together with a new on-site domestic waste-water treatment system to current EPA standards and associated site works

    20140538 View details
  • Harps GAA Club Swan Road, Durrow, laois
    Description:

    Construction of new Extension to incorporate Gym, Changing rooms and Public toilets.

    14/243 View details
  • New PE Hall Castleblayney VEC Dublin/Carrickmacross Road , Castleblayney , monaghan
    Description:

    1. Removal of existing prefab classroom and prefab office plus demolition of existing boiler house and single staircase 2. Construction of a three storey extension (1,243m2) with metal pitched roof and roof-lights comprising classrooms, new stairs, offices, new boiler room ,stores & ancillary accommodation to south of existing main school building; construction of new stand alone two-storey PE hall (634m2)with metal pitched roof located on the north east corner of the school site ; construction of a new single storey extension with roof-lights ( 80m2) to west of the existing metalwork room and adjacent store; the provision of 4 temporary classrooms and temporary parking and site storage behind (to west of) existing building on the west campus 3. Redevelopment of existing school building including conversion of existing general purpose hall to provide music room and dining/kitchen/servery including two new doors to existing west elevation and 1 door to south elevation ; reorganisation of existing woodworking/construction studies rooms to include raising height of existing single storey roof and provision of new roof-lights. 4. Site works including the removal of 2no. pre-fabricated buildings, removal of one ball court , reorganisation of roadway and vehicular movement within school boundaries, provision of new ESB sub station, restructuring of parking provision to provide 41 parking spaces including 2 disabled spaces, bicycle parking frames ,provision of new steps and disabled access ramp, general landscaping; repair/reinstatement of existing south boundary; extension of existing oil storage tank; provision of new playing pitch adjacent to PE hall. Site works to include site set up/ hoarding and temporary construction entrances off Dublin/Carrickmacross Road . 5. The works will be carried out in two phases 1. Modifications to the stand alone PE hall building previously approved in planning permission CB12/1 resulting in a larger basketball regulation sports hall (increased from 15.8m x 26 m to 18m x 33m) resulting in a building with total floor area of (1,039m2). All other accommodation to be as planning permission CB 12/1 2. Construction of a new extension to the front (west façade of the school) facing onto the Dublin/Carrickmacross Road to provide a new canteen with kitchen facilities, housed under a pitched landscape roof with rooflights. 3. Site works including the relocation of two parking spaces currently located at the front of the school to a new location at the rear of the school, repositioning of existing sculpture at the front of the school, relocation of existing drainage routes, ancillary site works and general landscaping. Site works to include site set up/ hoarding and temporary construction entrances off Dublin/Carrickmacross Road . 4. The works will be carried out in two phases as per planning permission CB 12/1

    CB 12/1 & 14/40003 View details
  • Dwelling house at Rockfield 3, Turlough, Castlebar Rockfield 3, Turlough, Castlebar, mayo
    Description:

    Construct extension and alterations to existing dwelling house, treatment system and percolation area together with associated site works

    140217 View details

Pages

Filters

Local authority