Welcome to the Building Control Management System (BCMS)
BCMS Search results
The information requested and supplied was compiled by this office for the purposes of fulfilling the statutory obligation to maintain a publicly available register of building control activity.
As a holder of this information it is important that you should be aware of your obligations as a data controller under the Data Protection Acts 1988 and 2003.
While the provisions of the Data Protection Acts 1998 and 2003 are outside the scope of the Local Government Management Agency/Building Control Authority it is understood that they place clear limits on the use of publicly available data for marketing or other purposes. Any person who proposes to use such information in this way is considered to be a data controller for the purposes of the Data Protection Acts. Section 2(8) of the Data Protection Acts provides that where a data controller anticipates that personal data will be processed or used for the purposes of direct marketing, including personal data that is required by law to be made available to the public, the data controller shall inform the persons to whom the data relates so that they may object, by means of a request in writing to the data controller and free of charge, to such use.
Breaches of Data Protection legislation are a matter for the Data Protection Commissioner who has the power to investigate such matters and, where appropriate, prosecute offences under the Acts.
-
23-165 Construction of a detached dwelling house in Turin, Kilmaine, Co. Mayo Turin, , Kilmaine, Mayo,Description:
Construction of a dwelling house, proprietary wastewater treatment system and all associated site works
-
Glass Bottle Phase 2 – Blocks E1, E2 & E2A Glass Bottle Site, Sean Moore Road, , Ringsend, Dublin 4,Description:
Block E1, E2 and E2A Residential Blocks at Phase 2, Glass Bottle, Sean Moore Road, Dublin 4 Block E1, E2 & E2A Residential Blocks comprise of the following • Block E1 - Ground Floor + 7 upper floors • Block E2 - Ground Floor + 7 upper floors • Block E2A - Ground Floor + 7 upper floors In tandem to this application, 2No. additional commencement notices have been lodged as follows • Block D1 & D2 Residential Blocks • Phase 2 Basement (which is underneath and connected to Blocks D and E)
-
Change of use from office to residential to include modification to existing 2 storey building and additional floor Rear 97 Main Street, , Bray, Wicklow, A98 A2W6Description:
Change of use from office to residential to include modification to existing 2 storey building and additional floor with associated works at rear of 97 Main Street Bray Co. Wicklow.
-
Glass Bottle Phase 2 - Basement Glass Bottle Site, Sean Moore Road, , Ringsend, Dublin 4,Description:
Glass Bottle Phase 2 – Basement - 1No. Level of basement and associated basement escape stair and lift pop ups at Ground Level. The new residential development, Phase 2 Glass Bottle, will consist of five residential blocks situated over a common basement at Glass Bottle Site, Sean Moore Road, Dublin 4 This commencement notice comprises of the following • 1No. Level of basement and associated basement escape stair and lift pop ups at Ground Level. This commencement notice is concerned solely with the initial phase of the development which comprises the Basement Level. As part of this commencement notice, there is no accommodation proposed at Ground Floor Level or above Ground level with the exception of the stair and lift pop ups at Ground Level. In tandem to this commencement notice, 2 No. additional commencement notices have been lodged as follows: • Block D1 and D2 Residential • Block E1, E2 and E2A Residential Blocks
-
Construction of 2 storey extension, comprising 57 beds and associated material alterations to nursing home. Nursing Home, Dundalk Road, Carlingford, , Carlingford, Louth, A91 C853Description:
Construction of 2 storey extension, comprising 57 beds and associated material alterations to nursing home.
-
2713 - 36 Housing Units at Loughville, Lahinch Road, Ennis Co Clare Lahinch Road, , Ennis, Clare,Description:
The construction of 36 housing units and associated site services at at Loughville, Lahinch Road, Ennis Co Clare
-
Mezzanine, Harvery Norman Warehouse, Waterford Unit 1, Block 4 Lacken Road, Lacken Road Business Park, , Waterford, Waterford, X91 A262Description:
The construction of a 95sqm internal single storey mezzanine structure providing additional storage at Unit 1, Block 4 Lacken Road, Lacken Road Business Park, Waterford, X91 A262
-
Bath and Body Works / NEXT, Units 3&4/5 Opera Lane, Cork 4/5 Opera Lane, , Cork, Cork, T12 WY68Description:
Proposed material alterations arising from the amalgamation of Unit 03 with Unit 04/05 at Ground floor level on behalf of Bath and Body Works / NEXT on Opera Lane (Faulkner’s Lane) , Cork
Application No.: -
Becforde Phase#1 Bryanstown Cross route, , Drogheda, Meath, 0000000Description:
Phase#1 - Construction of units 1-38 and all associated site and civil works
-
Attic @ 73 Barton Drive 73 Barton Drive, , Dublin, South Dublin, D14 HE17Description:
a) removal of existing dormer to rear of existing dwelling, and b) the construction of a new flat-roof dormer to rear of dwelling, c) change of existing roof profile from hipped roof to Dutch-gable style roof, maintaining existing ridge height, with rooflight to side, c) alterations to existing side window at first floor level, and all associated site works.