Welcome to the Building Control Management System (BCMS)
BCMS Search results
The information requested and supplied was compiled by this office for the purposes of fulfilling the statutory obligation to maintain a publicly available register of building control activity.
As a holder of this information it is important that you should be aware of your obligations as a data controller under the Data Protection Acts 1988 and 2003.
While the provisions of the Data Protection Acts 1998 and 2003 are outside the scope of the Local Government Management Agency/Building Control Authority it is understood that they place clear limits on the use of publicly available data for marketing or other purposes. Any person who proposes to use such information in this way is considered to be a data controller for the purposes of the Data Protection Acts. Section 2(8) of the Data Protection Acts provides that where a data controller anticipates that personal data will be processed or used for the purposes of direct marketing, including personal data that is required by law to be made available to the public, the data controller shall inform the persons to whom the data relates so that they may object, by means of a request in writing to the data controller and free of charge, to such use.
Breaches of Data Protection legislation are a matter for the Data Protection Commissioner who has the power to investigate such matters and, where appropriate, prosecute offences under the Acts.
-
27A Rathgar Avenue 27A Rathgar Avenue, , Dublin, Dublin 6,Description:
The construction of 6 no. 3 storey & 1no 2 Storey Townhouses, associated site & landscaping works and new vehicular access from Rathgar Villas at Rathgar Avenue, Dublin 6, D06 X3T0 and 27A Rathgar Avenue, Dublin 6, D06 T0X6 which are to the rear of nos. 27, 28 & 29 Rathgar Avenue and adjoin Rathgar Villas by E.W.R. Rathgar Ltd, Ross Dunne & Joseph Dunne.
-
92 Residential Units at Ferrard Park & Court Twenties Lane, , Drogheda, Louth,Description:
34 Houses in Phase 1 of an overall development of 92 residential units
-
Clonburris T4 & T5 - Tile 5 Dwelling Houses Seven Mills, , Dublin, South Dublin,Description:
Construction of 125 no. Dwelling Houses and all ancillary site works on Tile 5 (CSW-S2) of Clonburris SDZ Planning Scheme
-
Clonburris T4 & T5 - Tile 4 Dwelling Houses Seven Mills, , Cappagh, South Dublin,Description:
Construction of 105 no. Dwelling Houses and all ancillary site works on Tile 4 (CSW-S1) of Clonburris SDZ Planning Scheme
-
Ballyrannel House Ballyrannel,, , Glenbrien, Enniscorthy,, Wexford,Description:
Proposed two story dwelling house and associated site development works.
-
Waterford Surgical Hub The Former Glanbia Site, Marypark Lane, , Waterford, Waterford,Description:
The construction of a part two and part three-storey Surgical Hub building with 2nd floor plant enclosure and roof level PV panels, 2 no. generator buildings, a diesel tank, a VIE (Vacuum Insulated Evaporator) compound, an ESB substation, a totem sign, 1. no pumping station and all associated car parking, signage, landscaping and site development works.
-
Harolds Cross Road, Dublin 6W Harolds Cross Road, , Dublin, Dublin 6W, D6W HP44Description:
The development will consist of the provision of 1 No. part 4 No. storey, 1000 No. pupil Post Primary School and 4 no. classroom Special Educational Needs Unit, with a gross floor area of c 11,632sq m, including a P.E Hall and General Purpose Hall and all ancillary teacher and pupil facilities.
-
LRD - Estate 4 Housing (71 Units) - Part of 210 Residential Unit Scheme. Alderwood, , Newtownmountkennedy, Wicklow,Description:
Estate 4 - 71 Residential Housing Units at Alderwood, Newtownmountkennedy, Co. Wicklow.
-
2650 Garage Derryglassaun derryglassaun, , Menlough, Galway,Description:
construction of a domestic garage and all associated works.
-
Intel Ireland F34 to F10 AMHS Cross Connect Collinstown Industrial Park, , Collinstown Industrial Park, Kildare, W23 N2T7Description:
• Extension of the existing F34 AMHS track system via LK1 Building into F10 North Support F-1 Occupancy and termination within the F10 Cleanroom H-5 Occupancy. Includes a 3-hr wall AMHS track fire door system to be installed in 2 no. locations. • Formation of new Cleanlink and Pedestrian Corridors within the F10 North Support with revised egress modifications. • New Fab and North Support Corridors MIMO cross connect Lobbies with both Man Door and Interstitial level maintenance doors access. • New staircase access to the Interstitial ceiling space (occupied for maintenance only) serving the AMHS track system. • Modified Fire Protection Sprinkler system. • Modified Fire Alarm system. • General compliance with the IBC, regarding the overall Fire Code Strategy of the design. • Modifications to the existing 3-hr plasterboard fire separation walling and supporting steelwork structure to the LK1-F10 interface for the AMHS crossing. • Modifications to the existing 8 inch (200mm) thick in-situ concrete walling 3-hr fire separation walling to the F10 North Support and F10 Fab interface for the AMHS crossing (noting 2 no. separate buildings here). • New Mech ventilation installation to serve the Cleanroom AMHS-Pedestrian Corridor track routing with 1 CFM ventilation and exhaust to meet Intel Cleanroom protocol requirements. • Additional Support rooms and spatial modifications to the North Support Fab level areas. Existing temporary building retrofitted for a Dry Waste Compound to the north side of F10 RODI/AWN structures. • 1 no. new MAH unit mounted at grade level to the underside of the LK1 Building (external undercroft).
Application No.: