Welcome to the Building Control Management System (BCMS)
BCMS Search results
The information requested and supplied was compiled by this office for the purposes of fulfilling the statutory obligation to maintain a publicly available register of building control activity.
As a holder of this information it is important that you should be aware of your obligations as a data controller under the Data Protection Acts 1988 and 2003.
While the provisions of the Data Protection Acts 1998 and 2003 are outside the scope of the Local Government Management Agency/Building Control Authority it is understood that they place clear limits on the use of publicly available data for marketing or other purposes. Any person who proposes to use such information in this way is considered to be a data controller for the purposes of the Data Protection Acts. Section 2(8) of the Data Protection Acts provides that where a data controller anticipates that personal data will be processed or used for the purposes of direct marketing, including personal data that is required by law to be made available to the public, the data controller shall inform the persons to whom the data relates so that they may object, by means of a request in writing to the data controller and free of charge, to such use.
Breaches of Data Protection legislation are a matter for the Data Protection Commissioner who has the power to investigate such matters and, where appropriate, prosecute offences under the Acts.
-
2303_CLOONACROSS Cloonacross, , Milltown, Galway, H54 X020Description:
Works to existing bungalow to include new windows & doors and external insulation, the construction of a single story extension to the side and the construction of a new wastewater treatment system and associated site works.
-
Attic Conversion at No. 2 Rathmore Green, Barrack Green, Barrack Street, Kinsale, Co.Cork No. 2 Rathmore Green, Barrack Green, Barrack Street, , Kinsale, Cork, P17 PW83Description:
Permission for alterations, elevational changes, development of the attic area to habitable accommodation, the installation of 3 no. roof lights, 1 to the front elevation and 2 to the rear elevation with all associated site works to their property.
-
21, Parkside Close, Balgriffin, Dublin 13 21 Parkside Close, , Dublin 13, Dublin 13, D13 H0C3Description:
the conversion of existing attic space to a bedroom + ensuite, a dormer roof to the rear elevation, new roof windows to the front, internal modifications and all associated site works
-
Phase 2D: Residential Development, 35 - 50 and 52 - 142 Gort Mell, Drogheda, Co. Louth. 30 Gort Mell, , Drogheda, Louth,Description:
Construction of 107 dwellings at 35 - 50 and 52 - 142 Gort Mell, Drogheda, Co. Louth.
-
Side of 47 Glin Road Dublin 17 Glin Road, , Coolock, Dublin 17,Description:
detached house to side
-
NZEB training centre for Mayo Sligo Leitrim ETB. Unit 1 Union Road Business Park, , Collooney, Sligo, F91 E161Description:
Alterations & fit out works to existing building including new external openings, new fenced compound, external store and site signage, together with all ancillary works
-
10 Charles St. New Ross Charles St, , New Ross, Wexford, Y34 KN97Description:
Refurbishment and remodelling of existing office/residential building
Application No.: -
Construction Of A Bungalow Type Dwelling House Kenagh, , Keenagh, Longford,Description:
Construction Of A Bungalow Type Dwelling House
-
No. 7 Cleve Hill, Blackrock Road, Cork 7 Cleve Hill Blackrock Road, , Cork, Cork, T12 XN9XDescription:
No. 7 Cleve Hill, Blackrock Road, Cork: The demolition of existing garage and the construction of a two-storey extension and all associated site works.
-
69 Silchester Park, Glenageary Silchester Park, , Dublin, Dunlaoghaire Rathdown , A96 H5C6Description:
Development consisting of alterations to the existing Planning Permission Reference D24A/0008. The additional works will consist of extending part of the ground floor by 1m into the side (northwest), the construction of a further first floor extension to the front and side, associated façade and internal modifications, and the widening of the existing vehicular access to 3.5m. The development will include all associated ancillary works, landscaping and services.